The crew made a lot of progress on the modules for the expansion of the railroad. My goal for the next two weeks is to get them all wired and standing so we can work on the next phase – connecting the existing layout to the module groups.

I should have all of the modules standing and connected to make sure the plan works. We will then work on a couple of items:
- Building the connectors (in yellow) so we can eventually connect the entire layout together.
- Adding Cork for the main line (until we run out that is).
- Dry fitting turnouts and track to see if the plan makes sense.
A meal will be provided. I will have snacks, sugar free soda and water available for the crew.