The Benchwork on the long wall of the room which measures 32 feet long.
Opposite side of room with staging level and level 1 benchwork in place
Good view of room from far corner.
Mike White hard at it.
Cutting OSB for the mushroom deck.
Crew for the November work session on the Hi-Line Sub.
Transition from Helix 1 to staging on lower level and Helix to Level 1.
Staging tracks starting to go down.
A view of staging at the far end of the room. This is under Whitefish. 8 tracks on the first two walls, 7 tracks on the other areas.
I had to put some cars on the track and test out my track laying. The curves in the corner are tighter than on the open areas of the layout, so I wanted to test clearances.
Here is one end of the N-scale layout that will represent Great Falls. This will be located in an adjacent room and will provide some switching action, like Bill Kirchmeyer, just in a different scale.
This is the turnback section of the staging which is located on the short wall of the room.
I finally made it the penninsula and mushroom area.
Pennisula end with mushroom support brackets and staging brackets/facia in place.