CB&Q Zone 3 Construction – CANCELLED

      Comments Off on CB&Q Zone 3 Construction – CANCELLED
When: Saturday, January 18th, 2025 from 10:00 am to 4:00 pm

Work Session Cancelled! The power for the garage heater doesn’t work and it’s too cold to do anything in the garage. Once that is fixed I’ll look to reschedule. Thank you to those who offered to help.

The only way I am going to get started on this build is to actually schedule something. I should have the heater installed so the garage will be warm. The day will mostly be split up using the table saw to clean up the lumber scrapped from the old layout, so it could be loud, and removing some peg board from the rear wall. If all goes as planned, there shouldn’t be much moving as that was done previously.

The plan is to build the benchwork for this part of the build. The rest of the layout will be modular and will be started after this phase is fully functional. We’ll build just the benchwork in this step. All of the materials needed for this will be ready once the table saw work is done. Lunch will be provided.

Note: Once this is done I will likely hold weekly work sessions on Thursday evenings to get the rest of the stuff done. I just need one good day to push out the basic structure. Then we can add wiring, tops, cork, track, etc. Eventually we’ll get to the two modular sections to build the complete railroad.

 

Registration

You must be logged in to register

Call Board

Ron Copher - January 2nd, 2025
Al Lesky - January 5th, 2025
Thomas Heilman - January 6th, 2025

Extra Board

No Registrations